Professional Leadwork
Expert lead flashing installation and repair around chimneys, dormers, valleys, and skylights.
At a Glance
Lead is the most durable flashing material available — correctly installed, it lasts 60 years or more. Most leadwork repairs are completed in half a day to a full day. All our leadwork is carried out to Lead Sheet Association Code of Practice standards, covering chimneys, valleys, dormers, skylights, and parapet walls.
What We Fix
Common Issues We Address
Corroded or Cracked Lead
Over time, lead can oxidise, crack, or split — especially where it has been incorrectly installed without adequate expansion allowance.
Poorly Sealed Joints
Failed joints between lead and masonry or tiles are a common source of stubborn leaks.
Slipped Lead
Lead that has not been properly fixed can slip and expose the underlying structure to water ingress.
Valley Deterioration
Lead valleys running between roof pitches are subject to constant water flow and require periodic inspection and maintenance.
Expertise You Can See
Examples of our leadwork work across Kent and SE London.
How We Work
Our Process
Inspection
We trace any leaks to their source and assess the full extent of leadwork required.
Specification
We specify the correct lead code and method for your application.
Installation
Skilled leadwork carried out to Code of Practice standards.
Inspection & Seal
All new leadwork is checked and dressed, with pointing renewed where required.
Common Questions
Frequently Asked Questions
How long does lead flashing last?
Can you repair existing leadwork rather than replacing it?
Request a Free Quote
Fill in the form below and we will be in touch within one working day.